Accelerator Performance and Preparations for Run II

3/30/00


Click here to start


Table of Contents

Accelerator Performance and Preparations for Run II

Long Range Schedule

FNAL Accelerator Complex

Operating Hours

Beam Delivered

Fixed Target Run Statistics

E-835 Charmonium Experiment

Antiproton Source E-835 Operation

Antiproton Source Tune Tracker

Future Fixed Target

Slow Extraction from MI

8 GeV Fixed Target

Run II Luminosity Goals

Commissioning

Tevatron Collider Luminosity by Year

Luminosity Formula

Run II Parameters

Luminosity Formula

Preparations for Run II

Preparations for Run II

Collider Changeover Shutdown Activities

Tevatron ì1 TeV ì

Quench History

Quench Current vs Temperature for a few low quench current magnets

Operating Modes The Number of Interactions per Crossing

7 rf bucket Bunch Spacing & Crossing Angles

Crossing angle for 132 nsec Bunch Spacing

Conclusion (Fixed Target)

Conclusion (Collider)

Author: John Marriner