Table of Contents
Accelerator Performanceand Preparations for Run II
Long Range Schedule
FNAL Accelerator Complex
Operating Hours
Beam Delivered
Fixed Target Run Statistics
E-835 Charmonium Experiment
Antiproton Source E-835 Operation
Antiproton SourceTune Tracker
Future Fixed Target
Slow Extraction from MI
8 GeV Fixed Target
Run II Luminosity Goals
Commissioning
Tevatron ColliderLuminosity by Year
Luminosity Formula
Run II Parameters
Luminosity Formula
Preparations for Run II
Preparations for Run II
Collider ChangeoverShutdown Activities
Tevatron ì1 TeV ì
Quench History
Quench Current vs Temperaturefor a few low quench current magnets
Operating Modes The Number of Interactions per Crossing
7 rf bucket Bunch Spacing & Crossing Angles
Crossing angle for 132 nsec Bunch Spacing
Conclusion (Fixed Target)
Conclusion(Collider)
|