TEVATRON Collider Luminosity Upgrades

3/31/00


Click here to start


Table of Contents

TEVATRON Collider Luminosity Upgrades

Run II Luminosity Goals

Luminosity Formula

Luminosity vs. Antiproton Intensity

Run II Parameters

More Antiprotons

Luminosity Upgrade Schedule

Slip Stacking

Slip Stacking

Slip Stacking Experiment in the Main Ring

Beam Loading Compensation using Direct RF Feedback

Beam Sweeping at the Antiproton Production Target

Liquid Lithium Lens

BINP Liquid Lithium Lens Prototype

Antiproton Aperture Increases

TEV 1 Antiproton Yield vs. Acceptance

Debuncher Cooling Cryogenic Multiband Cooling Systems

Accumulator Stochastic Cooling Cooling Bandwidth Increases

4-8 GHz Accumulator Stack Tail System

Accumulator to Recycler Beam Transfer (AP-5)

Recycler Electron Cooling

Schematic Layout of Recycler Electron Cooling

Electron Cooling Proof-of-Principle (Recirculation experiment)

Beam-Beam Tune Shift Compensation

TEVATRON Electron Lens Prototype

TEVATRON Electron Lens Prototype (located in LINAC basement)

Author: Dave McGinnis

Security, Privacy, Legal