Proton Source Dept. Booster Linac
Proton Improvement Plan - PIP

Welcome to Proton Improvement Plan Web Page

The official PIP repository for Talks/Presentations is AD/DocDB.
You can search for PIP documents by selecting Topics: Project: PIP or Keywords: Upgrades, Linac, Booster, PIP.
For you convenience, this page collects all the Talks/Presentations given by members of PIP Project.



Table of Contents
Management Meetings | PMG Meetings | AEM Meetings | Status Report Meetings | Special Meetings


PIP Management Meeting

Where: Penthouse (Booster West Towers)
When: Every Monday, 13:00

[back to top] | Home | Communicate | Collaborate LearnMore


PIP PMG Meetings

Where: WH2 conference rooms. Final room arrangement is set close to the metting date.
When: First Thursday of every three months (13:00 - 14:00 CT)

Next Meeting: November 2017, Commitium

2017/09/07 - Q3 - PIP Overview
2017/05/11 - Q2 - PIP Overview
2017/02/02 - Q1 - PIP Overview

2016/11/03 - Q4 - PIP Overview
2016/08/04 - Q3 - PIP Overview
2016/05/05 - Q2 - PIP Overview
2016/02/04 - Q1 - PIP Overview

2015/11/06 - Q4 - PIP Overview
2015/08/06 - Q3+ - PIP Overview
2015/05/07 - Q2+ - PIP Overview
2015/03/05 - Q1/Q2 - PIP Overview - Linac Laser Notch System

2014/10/08 - Q4 - PIP Overview - Booster Cogging
2014/07/08 - Q1/Q2/Q3 - PIP Overview - Linac Modulator Upgrade
2014/04/26 - Q1 Canceled.
2013/11/27 - Q4 - PIP Overview - Booster Cavity Refurbishment
2013/08/21 - Q3 - PIP Overview - Booster Notcher System
2013/05/23 - Q2 - PIP Overview - RFQ Injector Line
2013/01/31 - Q1 - PIP Overview

2012/10/25 - Q4 - PIP Overview - PIP Project Controls
2012/08/02 - Q3 - First PIP PMG
[back to top] | Home | Communicate | Collaborate LearnMore


PIP @ AEM Meetings

Where: Curia II.
When: First Monday of the month- every three months (16:00 - 17:00 CT)

Next Meeting: January 9, 2017 -- PIP stopped being invited to AEM reports in Jan'17.

[back to top] | Home | Communicate | Collaborate LearnMore


Status Report Weekly Meeting

Where: Penthouse (Booster West Towers)
When: Wednesday, 10:30 A.M.

2011 | 2012 | 2013 | 2014 | 2015 | 2016 | 2017 |

2017 Contributions
Beams-Doc # Topic Presentation Title Speaker Date
5352 Linac Laser Notch Status Report D. Johnson 2017/05/26
5430 General General Info
Project Schedule & Budget Status
B. Pellico | K. Domann 2017/04/26
Booster Booster RF Status R. Padilla
5371 General General Info B. Pellico 2017/04/19
5371 Booster Booster Collimator Studies
Booster Losses during Collimator Studies
V. Kapin
R. Tesarek
5354 General Project Schedule & Budget B. Pellico
K. Domann
2017/03/22
5351 Booster Booster Synchrotron Studies C. Bhat
5352 Linac Laser Notcher Update D. Johnson
5345 General PIP General Information
Project Schedule & Budget
S. Chaurize
K. Domann
2017/03/08
Booster Status on Booster Perpendicular Measurements J. Kuharik
5338 Booster Status on Booster Beam Physics C.Y. Tan 2017/02/22
5340 Booster Status on Booster Collimator V. Kapin
5339 Booster Status on Booster Lattice A. Macridin
5317 General PIP General Information
Project Schedule & Budget
B. Pellico
K. Domann
2017/01/25
Linac Status on Marx Modulator M. Gardner
5308 General PIP General Information B. Pellico 2017/01/11
Booster Boo Stations 21&22 Plan R. Padilla


2016 Contributions
Beams-Doc # Topic Presentation Title Speaker Date
5300 General PIP General Information
PIP Budget and Schedule
B. Pellico
K. Domman
2016/12/21
Booster Status on Booster BPM System P. Prieto
5257 General PIP General Information
PIP Budget and Schedule
B. Pellico
K. Domman
2016/10/26
5260 Booster Booster Studies Summary C.Y. Tan
5261 General PIP General Information B. Pellico 2016/10/19
Linac Linac Laser Notcher Status T. Johnson
5240 General PIP General Information
PIP Budget and Schedule
B. Pellico
K. Domman
2016/09/28
Linac Linac Laser Notcher Shutdown Work
Marx Modulator Shutdown Work
T. Johnson
T. Butler
Booster Booster RF Stations Shutdown Work J. Reid/T. Kubicki
5239 General PIP General Information
B. Pellico 2016/09/14
Linac/Booster L4 reports L4 managers
5222 General PIP General Information
B. Pellico 2016/08/24
Booster Booster Collimation Status Report V. Kapin
5206 General PIP General Information
B. Pellico 2016/08/10
Linac Laser Notch status report D. Johnson
5200 General PIP General Information
PIP Project Schedule and Budget Report
F.G. Garcia
K. Domann
2016/07/27
Booster Status Report on Cavities 21&22 M. Slabaugh
5196 General PIP General Information & L4 short status reports B. Pellico 2016/07/13
5174 Booster Booster Transition Crossing C.Y. Tan | C. Bhat 2016/06/15
5142 General PIP General Information
Project Budget & Schedule
B. Pellico
K. Domann
2016/04/20
Booster LOCO Results C.Y. Tan
5136 General PIP General Information B. Pellico 2016/04/13
Booster Update Booster Perpendicular Cavity C.Y. Tan
5132 General PIP General Information B. Pellico 2016/04/06
Booster Update Booster Collimator Studies
Possible Non-Invasive Beam Profile Measurement
V. Kapin
R. Tesarek
5112 General PIP General Information
PIP Budget and Schedule
B. Pellico
K. Domann
2016/03/23
Linac Update on Marx Modulator T. Butler, M. Gardner
5113 General PIP General Information
PIP Budget and Schedule
B. Pellico
K. Domann
2016/03/02
Linac Update on Linac Laser Notcher System D. Johnson
5079 General Booster Collimators
V. Kapin 2016/02/17
5070 General PIP General Information
PIP Budget and Schedule
B. Pellico
K. Domann
2016/02/10
Linac Update on Linac Marx-Modulator T. Butler
5060 General PIP General Information B. Pellico 2016/01/27
Booster Stations 21 & 22 progress and M&S estimates
Early Injection Status
T. Kubicki
C. Bhat
5044 General PIP General Information B. Pellico 2016/01/13
Booster Cavity heating measurements and simulations
Progress and Plan toward Replacement Main RF Cavities
Progress and Plan toward Harmonic RF Cavities
M. Hassan
T. Kroc
CY Tan
5045 General PIP General Information
PIP budget/schedule report
B. Pellico
K. Domann
2016/01/06


2015 Contributions
Beams-Doc # Topic Presentation Title Speaker Date
4992 General PIP General Information
Project Schedule and Budget
B. Pellico
K. Domann
2015/10/28
Booster Booster RF Stations 21/22 T. Kubicki
Special Report Linac Linac Laser Notcher - Fiber Issues D. Johnson 2015/10/07
4960 General PIP General Information
Project Schedule and Budget
B. Pellico
K. Domann
2015/09/23
Booster 15 Hz Cavity Temperature Measurements and Analysis
M. Hassan & J. Reid
4937 General PIP General Information
Project Schedule and Budget
B. Pellico
K. Domann
2015/09/02
Linac Linac Modulator Status T. Butler
4920 General PIP General Information B. Pellico 2015/08/12
Booster Booster Anode Power Supply
Booster Collimator
R. Crawford
V. Kapin
Linac Laser Notcher D. Johnson
4902 General PIP General Information B. Pellico 2015/07/29
Booster Station 20 (Gallery) -- Stations 21 & 22 (Gallery)
Equipment for Stations 20, 21, & 22
T. Kubicki
4893 General PIP General Information
PIP Schedule and Budget
B. Pellico
K. Domann
2015/07/22
Linac Linac Modulator Update T. Butler
N/A Booster Anode Power Supply - Installation Plans (oral report) R. Crawford 2015/07/08
4871 General PIP General Information
PIP Schedule and Budget
B. Pellico
K. Domann
2015/06/23
Booster Cavity Refurb / Ceramic Windows / Cavities 21&22 M. Slabaugh
4865 General PIP General Information B. Pellico 2015/06/17
4864 Booster Simplified Modeling of Space Charge Losses in Booster at Injection A. Valishev
4852 General PIP General Information F.G. Garcia 2015/06/03
Booster Booster Anode Supply Upgrade R. Crawford
4846 General PIP General Information B. Pellico 2015/05/19
Linac Marx Modulator - Status Report T. Butler
Booster Booster Station 20 T. Kubicki
4820 General PIP General Information B. Pellico 2015/04/29
Booster Booster Anode supplies progress and plans for testing/installing R. Crawford
Linac Linac Laser Notch Progress D. Johnson
4812 General PIP General Information
Project Schedule & Budget Report
B. Pellico
K. Domann
2015/04/22
Booster Booster Collimator Update V. Kapin
4801 General PIP General Information
PIP Shutdown Activities
B. Pellico
J. Compton
2015/04/08
4795 General PIP General Information B. Zwaska 2015/04/01
Booster Gallery modifications for Stations 21 & 22 R. Tomlin
4794 General PIP General Information
Project Schedule & Budget Report
B. Pellico
K. Domann
2015/03/25
Booster Bias Supply Update P. Sheahan
4784 General PIP General Information
PIP Shutdown Activities
B. Pellico
J. Compton
2015/03/11
Booster Momentum Cogging Status K. Seiya
4779 General PIP General Info B. Pellico 2015/03/04
Booster Anode PS & Transformer Update
LOCO
Dampers Update
R. Crawford
CY Tan
N. Eddy
4774 General PIP General Info
Project Schedule & Budget
B. Pellico
K. Domann
2015/02/25
Booster New Tuners from TD -- verbal discussion B. Robotham
Linac Linac Modulator Status Upgrade T. Butler, H. Pfeffer
4763 General PIP General Info - Plans for station 20 installation B. Pellico
K. Kubicki
2015/02/11
Booster Plans for Station 20 Installation - cont. K. Tripllet
4753 General PIP General Info
PIP Project Controls Report
B. Pellico
K. Domann
2015/01/28
Booster High Mu Ferrites Testing
Refurbshment cavity testing results and thermal measurements
P. Sheahan
J. Reid
4738 Linac Linac Laser Notcher D. Johnson et. al. 2015/01/14


2014 Contributions
Beams-Doc # Topic Presentation Title Speaker Date
4731 General PIP General Info
PIP Project Controls Report
B. Pellico
K. Domann
2014/12/17
Booster Booster Anode PS Status R. Crawford
4718 General PIP Project Controls Report
K. Domann 2014/11/19
Booster Booster Cavity Refurbishment Schedule J. Reid
4712 Booster Anode PS Status R. Crawford
4711 Linac Laser Notcher Pulse Energy Requirements - Demonstratrion Experiment D. Johnson
4693 General PIP General Info
PIP Project Controls Report
B. Pellico
K. Domann
2014/10/29
Linac Linac Modulator Upgrade T. Butler
Booster Booster Anode Power Supply R. Crawford
4684 General PIP Shutdown 2014 Status
K. Gollwtizer 2014/10/15
4669 General PIP Shutdown 2014 Status
J. Compton, D. Augustine, M. Gardner, M. Slabaugh, S. Chaurize 2014/09/17
4660 General PIP Shutdown 2014 Tasks
2014/08/20
Booster Anode PS
TLM's
Vacuum
Kickers
R. Crawford
T. Leveling
D. Augustine
S. Chaurize
Linac Vacuum
Utilities
Laser Notch
D. Augustine
M. Gardner
D. Johnson
4651 General PIP General Info
B. Pellico 2014/08/06
Booster Booster New Tuners J. Reid, M. Slabaugh
4646 General PIP General Info
Budget and RLS Status
B. Pellico
K. Domann
2014/07/30
Linac Linac Lattice V. Kapin
4631 General PIP General Info
Budget and RLS Status
B. Pellico
K. Domann
2014/07/02
Booster Upgrade on Cogging K. Seiya
4628 General PIP General Info B. Pellico 2014/06/25
Booster Booster Anode Power Supply Update
Booster BPM Upgrade Plans
Booster Perpendicular Bias Cavity Update
R. Crawford,
P. Prieto,
CY Tan
4620 General PIP General Info B. Pellico 2014/06/18
Booster Booster Cavity Refurbishment M. Slabaugh,
J. Reid
4609 General PIP General Info
Project Status & Budget
B. Pellico
K. Domann
2014/05/28
4587 General PIP General Info B. Pellico 2014/04/30
Booster Booster Damper Update N. Eddy
4585 General PIP General Info
Project Status & Budget
B. Pellico
K. Domann
2014/04/23
4584 Linac Linac Utilities - Shutdown Activities M. Gardner
4569 General PIP General Info B. Pellico 2014/04/09
4568 Booster A Look at The Longitudinal Beam Dynamics of the Booster Beam:Experiment and Simulations C. Bhat
Oral Report General PIP General Info B. Zwaska 2014/04/02
4564
4565
Booster 2nd Harmonic RF Perpendicular biased cavity update
Booster Bias Supply
C.Y. Tan
P. Sheahan
4554 General PIP General Info B. Pellico 2014/03/12
Booster Booster Notch Status Report
Booster Anode Bias Supply
S. Chaurize
R. Crawford
4547 General PIP General Info
Project Status & Budget
B. Pellico
K. Domann
2014/02/19
4546 Booster Booster Energy Spread Measurements C. Bhat
4538 General PIP General Info F.G. Garcia 2014/02/12
4536 Booster Booster Optics Measurements CY Tan


2013 Contributions
Beams-Doc # Topic Presentation Title Speaker Date
4501 General PIP General Info B. Pellico 2013/12/18
4501 Linac Modulator: 3-staging results
SLAC Visit Report
H. Pfeffer
T. Butler
4492 General PIP General Info
PIP Schedule and Budget
B. Pellico
K. Domann
2013/12/03
4490
4492
Booster Short Kickers PS
Cogging
C. Jensen
K. Seiya
4479 Booster Preliminary consideration of perpendicularly biased Booster Cavity G. Romanov 2013/11/06
4480 General PIP General Info
PIP Schedule and Budget
B. Pellico
K. Domann
2013/10/23
4453 General PIP General Info B. Pellico 2013/09/18
4454 Linac Source Development D. Bollinger
N/A Booster Plans for new Ferrite Measurements and Tuner Integration P. Sheahan & J. Reid
General PIP General Info B. Zwaska 2013/09/11
4441 Linac Linac Laser Notcher Status D. Johnson
4443 Booster Booster New Cavities M. Hassan
4430 General PIP General Info
Project Schedule and Budget Report
B. Pellico
K. Domann
2013/08/21
4431 Booster Booster Aperture and Alignment K. Seiya
4412 General PIP General Info B. Pellico
K. Domann
2013/06/26
4392 General PIP General Info B. Pellico 2013/06/12
4380 Linac TraceWin 3D Simulations of the Fermilab Linac J.P. Carneiro
4366 General PIP General Info B. Pellico 2013/05/08
4363
4365
Booster Plans for Booster and Linac Transformer Installation
Vacuum Installation Complete and Plans
R. Crawford
D. Augustine
4353
4352
General PIP General Info
PIP Budget Report
B. Pellico
K. Domann
2013/04/24
4351 (private) Linac Linac 200 MHz HLRF - CPI Visit (private location) F.G. Garcia
4336 General PIP General Info B. Pellico 2013/04/10
4337 Booster Booster Optics Correction Procedure and Results E. Gianfelice-Wendt
4333 General PIP General Info B. Pellico 2013/04/03
4334 Linac Linac Modulator Update T. Butler
4335 Booster Booster Transition Crossing Y. Alexahin
4325
4330
General PIP General Info
PIP Schedule and Status
B. Zwaska
K. Domann
2013/03/27
4311 General PIP General Info B. Pellico 2013/03/13
4313
4312
Booster Plans for Booster Optics Correction
Booster Ferrite Bias Supplies Upgrade
E. Gianfelice-Wendt & M. McAteer
P. Sheahan
4307 General PIP General Info B. Pellico 2013/03/06
4308
4306
Linac Linac/400MeV BPMs Upgrade
Linac Laser Notcher Upgrade
E. McCroy
D. Johnson
4302
4303
General PIP General Info
PIP Schedule and Status
B. Pellico
K. Domann
2013/02/20
4301
4304
Booster Booster Notcher Installation
Booster Aperture Scans
S. Chaurize
K. Seiya
4292 General PIP General Info B. Pellico 2013/02/13
4293 Linac Status of Low Energy Linac Lattice V. Kapin
4278
4280
General PIP General Info
PIP Schedule and Status
B. Zwaska
K. Domann
2013/30/01
4282/a> Booster Booster Transverse Damper Algoritms T. Zolkin
4273 General PIP General Info B. Pellico 2013/16/01
4274 Booster Simulations of Booster Transverse Instabilities A. Macridin
4270 General PIP General Info B. Pellico 2013/09/01
4268
4267
Booster Booster LCW Upgrades - Final Report
Booster Notch Absorber Installation
D. Hixon
V. Sidorov


2012 Contributions
Beams-Doc # Topic Presentation Title Speaker Date
4265
4263
General PIP General Info
Schedule and Finances
B. Pellico
K. Domann
2012/19/12
4262 Linac Linac Modulator Prototyping H. Pfeffer
4259 General PIP General Info B. Pellico 2012/12/12
4266
4261
Booster Collected results from first four cavity refurbishments, new-ferrite tuner, potential stem interface modifications, and cavity 1013
Booster Start up plans
J. Reid
T. Sullivan
4259 General PIP General Info B. Pellico 2012/12/05
4257
4256
Linac RFQ Commissioning Status
Linac Start up plans
CY Tan
F.G. Garcia
4253
4255
4254
General PIP General Info
Project Status
University Collaboration with PIP
B. Pellico
K. Domann
B. Zwaska
2012/28/07
4245
4246
General PIP General Info
Project Status
B. Pellico
E. Peoples-Evans &
K. Domann
2012/11/07
4240 General PIP General Info B. Pellico 2012/10/24
4241
4242
Booster Third Booster RF Cavity Refurbish
Booster Notched Beam Kicker Pulser
J. Reid
S. Chaurize
4239 General PIP General Info B. Pellico 2012/10/10
4237 Linac Linac Notcher Plans D. Johnson
4234 General PIP General Info B. Pellico 2012/10/03
4233
Linac Linac HLRF (private) J. Steimel
4235
Booster Booster RF Power Amplifiers S. Kotz
4230
4231
General PIP General Info
Schedule Update and Status Report
B. Pellico
K. Domann
2012/09/26
4228
Linac Linac MCC/Transformer, Hatch and Booster Transformer, Anode Supply R. Crawford
4229
Booster Booster LCW D. Hixson
4223
General PIP General Info B. Pellico 2012/09/19
4220
Linac New Source for the RFQ D. Bollinger
4221
Booster L13 Absorber Final Design and Installation Plan V. Sidorov
4214
General PIP General Info B. Pellico 2012/09/12
4216
4217
Linac Linac Modulator Status Report (posted as private)
RFQ platform installation
T. Butler
S. Chaurize
4207
General PIP General Info B. Pellico 2012/08/29
4205
4210
Linac RFQ Overall Installation
Power Amplifier for the RFQ
CY Tan
B. Schupbach
4204
General PIP General Info B. Pellico
E. Peoples-Evans
2012/08/21
4203
4198
Booster Booster RF Modulators
Booster Cogging Hardware
R. Padilla
C. Drennan
4200
General PIP General Info B. Pellico 2012/08/15
4197
4195
4209
Booster High-Power Ferrite Testing
Linac and Booster Transformers
L13 Absorber
Dennis & Kiyomi
R. Crawford
S. Chaurize
4193
General PIP General Info B. Pellico 2012/08/08
4192 Linac Linac BPMs Upgrade - Status Repot N. Eddy
4183
General PIP General Info
PIP budget & schedule updates
B. Pellico
E. Peoples-Evans
2012/07/25
4182
General PIP General Info B. Pellico 2012/07/18
Booster Station 7 Refurb Lessons Learned M. Slabaugh
4179
4180
Booster Bias Supplies & Cavity Teststand
Station 7 Refurb High-Power Testing
P. Sheahan
J. Reid
4181
General Info PIP General Info B. Pellico 2012/07/11
Booster High Power Ferrite Testing
Booster Cogging
D. Barak
K. Seiya
4177 Linac RFQ Repair and Installation Plan C.Y. Tan
4168
General Info PIP General Info B. Zwaska 2012/06/27
4167
4166
Linac Linac Substation L1 Status Upgrade
Linac Laser Notcher Status Report
R. Crawford
D. Johnson
4164
General Info PIP General Info B. Pellico 2012/06/13
Booster 150 kW Amplifiers,
Booster Lattice Measurements
Short Kickers
S. Kotz
M. McAteer
S. Chaurize
4156
General Info PIP General Info B. Pellico 2012/06/06
Booster Booster Beam Study results K. Seiya
Linac Vacuum Update,
High Power RF
D. Augustine
J. Steimel
4155 Linac BPM Status Update N. Eddy
4140
General Info PIP General Info B. Pellico 2012/05/30
Booster RFQ Injector Status,
Booster Cavity Refurbshment,
Booster Absorber,
Booster LCW
CY Tan
M. Slabaugh
V. Sidorov
D. Hixon
4135
General Info PIP General Info B. Pellico 2012/05/23
Booster Booster Solid State Status,
Booster Modulator Status,
High Power Ferrite Testing
T. Kubicki
R. Padilla
D. Barak
4113
4114
General PIP General Info
Proton Source Shutdown Schedule
B. Pellico
M. Convery
2012/04/18
4111
General PIP General Info
Highlights of PIP schedule & statusing (general discussions, QA)
B. Pellico
Elmie Peoples-Evans
2012/04/11
4105
General PIP General Info B. Pellico 2012/04/04
4106 Booster Review of the L13 Absorber and Recent Progress S. Chaurize
4104
General PIP General Info B. Pellico 2012/03/28
4103 Booster PIP Presentation on Booster Main Injector Phase Lock C. Drennan
4100
General PIP General Info B. Pellico 2012/03/21
4096
4097
Linac Linac Substation L1 Upgrade
200 MHz Modulator Upgrade - Status Report
R. Crawford
T. Butler
4088
General PIP General Info B. Pellico 2012/03/14
4089 Booster IPM-BPM Correlation & Quad Steering Measurements M. McAteer
4083
General PIP General Info B. Pellico 2012/03/07
4084
4082
Booster First Refurbished Booster RF CAvity for 15 Hz
Booster RF Tuner and Cavity Refurbishment
J. Reid
M. Slabaugh
4078
General PIP General Info B. Pellico 2012/03/01
4079 Booster Booster Alignment & Magnet Moves K. Seiya
4066
General PIP General Info
PIP Schedule Summary
B. Pellico
E. Peoples-Evans
2012/02/08
4065
General PIP General Info B. Pellico 2012/02/01
4068 Booster Booster Solid State Driver Upgrade Update T. Kubicki
4057
General PIP General Info B. Pellico 2012/01/25
4058
General PIP General Info B. Pellico 2012/01/18
4050

4049
Booster Progress in the RF/Therman Modeling Effort of the Booster Cavity
Booster Bias Supply Upgrade
M. H. Hassan
P. Sheahan
4041
General PIP General Info B. Pellico 2012/01/11
4042
Linac Linac Lattice Modelling & Measurements Hyung-Jin Kim
4040
Booster L13 Notch Absorber Design V. Sidorov
4036
4037
General PIP General Info
Proton Improvement Plan: View from the Directorate (and the DOE)
B. Pellico
S. Henderson
2012/01/04
4038
Booster Conclusions of study on booster Lattice & Optics A. Petrenko


2011 Contributions
Beams-Doc # Topic Presentation Title Speaker Date
4032
General PIP General Info B. Pellico 2011/12/21
4028
4029
Booster Booster Damper Status
New Notcher and Beam Absorber
N. Eddy
I. Tropin & A. Drozhdin
4031
4022
General PIP General Info
Shutdown and Installation planning
B. Pellico
M. Convery
2011/12/14
4018
General PIP General Info B. Pellico 2011/12/07

4015
Booster Booster Notching System
S. Chaurize
4017
General PIP General Info B. Pellico 2011/11/30

4016
Booster Booster Anode PS Status & Strategy (verbal report)
Booster Bias Supply Upgrade
J. Reid
P. Sheahan
4008
General PIP General Info Bob Zwaska (for B. Pellico) 2011/11/23
4004
4006
Booster New Ferrite Cores for Booster Rf Cavity Tuners
Orbit Response Matrix Measurements and Model Calibration for the Fermilab Booster
R. Pasquinelli
A. Petrenko
4007
Linac Linac L1 Transformer Upgrade S. Hays
3998
General PIP General Info B. Zwaska (for B. Pellico) 2011/11/16
3999
3997
3996
Booster Booster Bias Supply and Cavity Upgrade
Booster Cogging Upgrades
Booster Laser Notcher Proposal
P. Sheahan
K. Seiya
D. Johnson
3989
3992
3993
Booster Booster Linear Couplig Measurement and Comparison with MAD8
Optic Measurements in Booster
Booster Alignment $ Magnet Moves
Eliana Giangelice
Meghan McAteer
Kiyomi Seiya
2011/11/09
3985
3988
Linac
PreAcc
PIP - Linac: 7835 Procurement Strategy
PIP - The H- inejctor Upgrade
Fernanda G. Garcia
Cheng-Yang Tan
2011/11/02
3979 Linac Linac RF Modulators New Specifications Trevor Butler 2011/11/01
3976 General PIP Budget Codes FY12 Updates William Pellico 2011/10/25
3952 Booster Spare Cavity Status and Tuner Update Matt Slabaugh 2011/09/28
3946 Booster Laser Notcher for Booster David Johnson 2011/09/19
3936 Linac Linac/400MeV BPM Systems Plans and Status Nathan Eddy 2011/09/07
3935 Linac/Booster Proton Source Vacuum Plan David Augustine 2011/09/02
3932 Linac Linac Momentum Dump Vacuum Repair - Final Design 2011 Robert Reilly 2011/08/31
3931 Booster Status Report on the Installation of SolidState Conversiond for Booster Stations 1 & 2 Steve Kotz 2011/08/31
3930 Booster 2012 Booster LCW Improvement Plan Overview David Hixson 2011/08/29
3926 General PIP - Preliminary Overview of FY12 Bob Webber 2011/08/24
3967 Booster PIP and the Booster Notch Bob Zwaska 2011/08/12
3921
3920
Booster Initial Simulations of Performance Limitations of the Booster RF CAvity
PIP Booster RF Spare Cavity Status
Mohamed H. Hassan
Matt Slabaugh
2011/08/10
3913
3912
3911
Booster Booster SolidState Driver Upgrade
Booster RF Modulator Upgrade
TD Cost Estimate for Booster Tuners
Tom Kubicki
Rene Padilla
Thomas Gardner
2011/08/02



Special Meetings

Special meetings are called on an as-needed basis.

Where:Huddle
When: Wednesday, 13:00

2015/10/07 Linac Laser Notcher
Chairwed by: F.G. Garcia
Attendees: B. Pellico, K. Gollwitzer, F.G. Garcia, D.E. Johnson, T. Hohnson, M. Gardner, R. Tomlin

2015/08/27 Booster Anode Power Supply Scheduling Meeting
Chairwed by: K. Gollwitzer
Attendees: B. Pellico, K. Gollwitzer, B. Zwaska, F.G. Garcia, R. Crawford, T. Sullivan, S. Chaurize, J. Compton, J. Ransom

2013/09/23 Linac Solid State Amplifiers Meeting
Chairwed by: T. Butler
Attendees: B. Pellico, K. Gollwitzer, R. Pasquineli, J. Reid, A. Moretti, B. Schupbach

2013/07/03 Booster Cavities Meeting
Chairwed by: B. Zwaska
Attendees: B. Pellico, K. Gollwitzer, B. Zwaska, M. Hassan

2013/01/08 Budget Meeting
Chairwed by: B. Pellico
Attendees: B. Pellico, K. Gollwitzer, B. Zwaska, F.G. Garcia, A. Nestander, K. Domann

2012/11/26 Status on Booster Shielding Assessment
Chairwed by: B. Pellico
Attendees: B. Pellico, K. Gollwitzer, B. Zwaska, F.G. Garcia, W. Schmitt, B. Higgins, M. Vincent, T. Sullivan

2012/09/19 Status on Booster Shielding Assessment
Chairwed by: B. Pellico
Attendees: B. Pellico, K. Gollwitzer, B. Zwaska, F.G. Garcia, W. Schmitt, B. Higgins, M. Vincent, T. Sullivan

2012/07/25 Status Update on Linac HLRF
Chairwed by: Fernanda G. Garcia
Attendees: B. Pellico, E. E-Peoples, K. Gollwitzer, J. Steimel, V. Lebedev

2011/11/22 Linac HLRF Kickoff Meeting
Chaired by: Fernanda G. Garcia
Attendees: A. Moretti, W. Pellico, J. Steimel, J. Walters

2011/11/16 Update on Booster RF Sub-Projects
Chaired by: Keith Golltwitzer
Attendees: K. Gollwitzer, D. Peterson, J. Reid, P. Sheahan, M. Slabaugh

2011/11/15 Booster Ferrite Tester
Chaired by: Fernanda G. Garcia
Attendees: D. Augustine, J. Duncan, S. Hays, M. Kufer, R. Pasquinelli, J. Reid

2011/07/27 Linac 200 MHz Modulator New Specifications
Chaired by: Bob Webber
Attendees: L. Allen, T. Butler, F.G. Garcia, R. Pasquinelli, W. Pellico, H. Pfeffer, B. Webber, D. Wolff