Tevatron Helix and Separators Scope Review

Commitee Report

Cover Letter

Meeting: Tuesday, August 26, 2003
8:30 - 16:30 (Presentations: 9:00 - 15:00)
Venue: Huddle

Main reason for review:

What is the best long term plan for helix operation and separator improvements as the intensity of the pbar ( and proton) bunches is increased?

[ Scope Review (WBS 1.3.4.4.5.3)Decision on creating additional space in the lattice and to build longer separators at the interaction regions.]

Charge:

  1. Review the present status of the beam helix scheme and possible/proposed near-term improvements and studies
    1. Present status
      1. Separator layout and operation
      2. Helix description at all stages of injection to store, and possible modifications with existing hardware
      3. Description of aperture used in sigma and mm, also transverse vs dispersion
      4. Dynamic aperture investigations, and comparison with aperture used
      5. Beam correction and differential correction schemes
    2. Near-term improvements and studies
      1. new helix up the ramp, no polarity reversal for roman pots, collimators
      2. higher gradient operation (for short times), 18x18 study, crossing angle at interaction points, smaller beta* ~25cm
      3. studies to include summary of studies so far, study plans and time needed in future
  2. Review potential long-term improvements - Where new separators could go, what would need to be done, what modifications to existing hardware. What are the perceived benefits, relative effort and risk. Is the schedule reasonable?
  3. Review and comment on possible gains from improvements.
  4. Comment on the technical plan for increasing the separators gradient. should this be part of the RunII Program or a separate R&D project?
  5. Suggest other possible approaches. Is there a consistent intergrated approach?

Upcoming Project Decisions

9/1/03 - Pursue additional and/or longer separators? Understand impact on other hardware, etc., that would need to be removed, relocated or modified.

4/28/04 - Pursue higher voltage operation and/or continue R&D


Agenda

08:30 - Executive Session

09:00 - 15:00 Presentations

  • Vladimir Shiltsev - Intro/Charge (20')
  • Ron Moore - Project Overview (20')
  • Tanaji Sen - Dynamic Aperture (45')
  • Yuri Alexahin - Optimizing Helices with Current Separator Configuration (45')
  • John Johnstone - Future Helix Upgrades (45')
  • Bruce Hanna - Separator Operation and Impact of Additional and/or Longer Separators
  • Rodger Bossert - Fabrication of Separators and Polarity Switches (20')
  • Gennady Romanov - R&D Correction Schemes, Feed-down Circut Operation, Modifying Lattice at A0 Straight Section (30')
  • Ron Moore - Summary (15')

    15:00 - 16:30 Executive Session

    There will be a lunch break and coffee/stretch breaks.

    Presentation time limits INCLUDE 5-10 minutes for questions/discussions.


    Reviewers

    Helen Edwards (chair)
    Gerry Annala
    Dave Finley
    Mike Syphers
    Charlie Sinclair
    Dave Rubin
    Gerry Dugan

    Documents:

    Committee Report:

    Outcome:


    Project Personnel

    Ron Moore - Project Manager
    John Johnstone - Future Helix Upgrades
    Yuri Alexahin - Optimize Separation with preasent separators
    Bruce Hanna - Tevatron Polarity switches for separators, coating of separators
    Gennady Romanov (TD) - R&D for coating of separator electrodes
    Rodger Bossert (TD) - Fabrication of polarity switches and separators
    Jim Walton (Tev Dept) - Separator and power supply expert; conditioning/commissioning separators


    Contact: Pushpa Bhat